KSPL Tariff Calculator
KSPL Tariff 2026-27 • Vessel & Cargo Estimation Dashboard
Vessel Estimate
₹0.00
Cargo Estimate
₹0.00
Grand Total
₹0.00
VESSEL / CALL INPUTS
Vessel Category
Gross Tonnage (GT)
Ballast Entry? (Yes/No)
Pilotage Entries
Tug Used for Pilotage? (Yes/No)
Berth Stay – Full 24 hr Periods
Berth Stay – Additional 8 hr Shifts
Berth Hire Multiplier
Naphtha Berth Double Charge? (Yes/No)
Ammonia Standby Pilot – 24 hr Days
Extra Berth Occupancy after Cargo Completion (Hours)
VESSEL CHARGES
Port Dues (USD)
$0.00
Pilotage / Tug (USD)
$0.00
Berth Hire – Normal (USD)
$0.00
Berth Hire – Extra 8 hr Shifts (USD)
$0.00
Ammonia Standby Pilot (USD)
$0.00
Extra Berth Occupancy (USD)
$0.00
Total Vessel Charges (USD)
$0.00
CARGO INPUTS
Cargo Type
Quantity
Quantity Unit
Liquid handled outside existing port pipeline? (Yes/No)
Vegetable Oil Common Corridor Pipeline (KL)
Customer POL/Fertilizer Pipeline Throughput (KL)
Port User Permissions / Shipping Bill / Bill of Entry
AUTOMATIC CARGO RATES / APPLICABILITY
Wharfage: ₹0
Tariff Unit: -
Royalty: ₹0 / MT
Pollution: ₹0 / MT
CARGO CHARGES
Wharfage (INR)
₹0.00
Liquid Cargo Outside Pipeline Surcharge (INR)
₹0.00
Vegetable Oil Corridor Pipeline (INR)
₹0.00
Customer POL/Fertilizer Pipeline Throughput (INR)
₹0.00
Pollution Control (INR)
₹0.00
Shipment Royalty (INR)
₹0.00
Port User Permissions (INR)
₹0.00
Total Cargo Charges (INR)
₹0.00
CURRENCY CONVERSION & GRAND TOTAL
Exchange Rate (INR per USD) – Optional
Total Vessel Charges Converted to INR
₹0.00
GRAND TOTAL
₹0.00
Tariff Upload / Rate Master
Edit yellow cells below when the tariff changes. Calculator updates automatically.
VESSEL TARIFF RATES
| Rate Code | Description | Rate | Unit |
|---|
CARGO TARIFF RATES
| Cargo Type | Wharfage | Tariff Unit | Royalty / MT | Pollution / MT |
|---|
OTHER SERVICES – REFERENCE RATES
| Service | Rate | Currency / Unit | Calculation Notes |
|---|---|---|---|
| Port Clearance Amendment | 3748 | INR each | Per amendment |
| Pilot / Movement Cancellation | 2536 | USD each | If cancelled 1 hour in advance; other cases may attract full pilotage |
| Detention – first half hour | 561 | USD/event | If vessel not ready after pilot boards |
| Detention – thereafter | 1122 | USD/hour or part | After first half hour |
| Cold Movement | 2x Pilotage | USD | Base pilotage doubled; extra tug time separately |
| Towage – tug 3001 HP and above | 7968 | USD first 2 hours | Additional hour 3984 USD |
| Towage – additional hour | 3984 | USD/hour or part | After first 2 hours |
| Pilot Launch | 318 | USD first 2 hours or part | Additional hour 159 USD |
| Pilot Launch – additional hour | 159 | USD/hour or part | After first 2 hours |
| Forklift up to 3 tons | 1544 | INR/hour or part | Minimum 7720 INR |
| Forklift above 3 to 5 tons | 2205 | INR/hour or part | Minimum 11025 INR |
| Fresh Water | 9.597 | INR/1000 litres | Minimum supply/charge basis 50 MT as tariff states |
| Mobile Silo | 7200 | INR/trip | Trip definition as tariff note |
| PPD chemicals to OSV | 220 | INR/KL or part | Special activity charge |
| Vegetable oil common corridor pipeline | 77 | INR/KL | Usage charge |
| Customer POL/Fertilizer pipeline throughput | 22 | INR/KL | Throughput charge |
| Pollution Cess | 5 | INR/MT | Bulk cargo handled |
| Port user service permission | 3696 | INR/permission | During vessel call |
| Wharfage minimum | 37802 | INR/vessel | Minimum cargo wharfage |